Sarawak Energy NEM subsidy
Sarawak NEM subsidy guide for rooftop solar.
How the Sarawak Energy subsidy for home solar works: the amounts, who qualifies, and the steps from installation to payment.
Subsidy amounts
A flat amount, by system size.
The subsidy is a one-off payment for eligible homeowners who install rooftop solar under Net Energy Metering. The amount depends on the inverter (AC) capacity of the system, up to RM 12,000.
- Applies to: NEM contracts signed in 2025 and 2026.
- Payment: from January 2026, including for contracts signed during 2025.
- Allocation: limited, and handled first come, first served.
| System capacity | Subsidy |
|---|---|
| 2.0 to 3.5 kWac | RM 8,000 |
| Above 3.5 to 6.0 kWac | RM 10,000 |
| Above 6.0 to 50 kWac | RM 12,000 |
Capacity is measured in kWac, the inverter output, not the panel capacity in kWp.
Who qualifies
Eligibility criteria.
All of these must be met.
Property type
A landed residential property: terrace, semi-detached or bungalow. Apartments and condominiums are excluded.
Tariff category
The electricity account must be under the Domestic Tariff.
Account holder
The registered SESCO account owner applies, and the bank account for payment must be in the same name.
Installer
The system must be installed by a service provider with Solar PV Designer certification from the Electrical Inspectorate Unit (EIU).
One claim
Each account owner can claim the subsidy once.
New systems only
Properties that already have solar PV installed are not eligible.
No battery storage
Battery energy storage systems are not allowed under this subsidy scheme.
How to apply
From installation to payment, and who does what.
01
Installation and NEM contract
AeanesDaT with licensed partner · you sign with Sarawak Energy
We design the system and a certified, EIU-registered partner installs and commissions it. You sign the NEM contract with Sarawak Energy.
02
Receive the application form
Sarawak Energy
Once eligibility is verified after installation, you receive the subsidy application form.
03
Meter installation
Sarawak Energy (SESCO)
SESCO installs a PV meter. The connection charge is paid by the customer: RM 500 for a single-phase smart meter, RM 1,000 for three-phase.
04
Submit the form within 7 days
You, with our help
Return the completed form within 7 days of receiving it. Late submissions may be rejected.
05
Payment
Sarawak Energy
The subsidy is transferred to your bank account within 14 calendar days of the form submission or the PV meter installation, whichever is later.
Check before you commit. This guide reflects the scheme as announced for 2025 and 2026. Amounts, charges, deadlines and eligibility are set by Sarawak Energy and can change, and the subsidy is not guaranteed. Confirm current terms with Sarawak Energy.
How we help
What AeanesDaT does for you.
- Eligibility review for domestic tariff, landed residential and account conditions.
- System sizing support for the relevant NEM subsidy capacity bands.
- Technical proposal preparation before submission and installation steps.
- Clear guidance on documents such as bills, address details, roof photos and owner information.
Questions
Is the Sarawak NEM subsidy guaranteed?
No. Subsidy availability depends on current Sarawak Energy rules, quota and successful compliance with the scheme requirements.
Can AeanesDaT help me check eligibility?
Yes. AeanesDaT can review your electricity bill, property type and expected system size before preparing the next steps.
Check your eligibility.
Send us your bill and property details. We will review your eligibility and likely system size before you commit to anything.
What helps us prepare a proposal
- Latest electricity bill showing the tariff and account name
- Property type and address
- Photos of the roof
- Whether any solar is already installed